Guides · Architecture and engineering firms · Deltek Ajera

Deltek Ajera vs BQE Core: which fits a small A/E firm?

By Vaughn English · Last updated

What this page is. A side-by-side of Deltek Ajera and BQE Core for a small architecture or engineering firm, from neither vendor. Every fact comes from Deltek’s and BQE’s own pages and help docs, with the date we checked. We sell neither product and have not moved a firm between them, so there are no client stories here.

Deltek Ajera vs BQE Core: neither publishes a price; Ajera includes the ledger, BQE Core sells Accounting as an extra module.Deltek Ajera vs BQE Core: what each publishesDeltek AjeraBQE CorePrice publishedNo, request a demoNo, per user, requesta quoteLedger insideYes, includedOnly with AccountingmodulePhase levelsUp to 6Up to 4HostingDeltek cloud or ownserverCloudTime importYes, .csv fileYes, .csv, 1,000 at atimeSource: Deltek and BQE pricing pages and help docs, checked 2026-10-05 to2026-10-08.
Neither vendor publishes a price. The biggest difference is where the books live.

The short answer

Both are built for architecture and engineering firms, and both handle time, phase budgets and billing. One fact separates them for a firm of 5 to 25 people.

Where your books live. Ajera is project management and accounting in one product. Deltek’s product page headline is “Project Management & Accounting in One Place” (deltek.com, checked 2026-10-08), and the general ledger, payables and receivables come with it. BQE Core’s base package covers time and expense, billing, project management and reporting. Accounting is an extra module. Without it, Core syncs with QuickBooks Online and the books stay there.

So if you want the ledger out of QuickBooks and into the same system as your projects, both can do that, and you compare Ajera with Core plus Accounting. If your bookkeeper wants to stay in QuickBooks, Core without Accounting is the one of the two built for that.

Price does not separate them, because neither publishes one. You need two written quotes with the same scope.

Side by side

Deltek Ajera BQE Core Source, date checked
What the vendor calls it “Project Management & Accounting in One Place” Per-user platform with a Foundations base and add-on modules deltek.com/ajera, bqe.com/pricing, 2026-10-08
Published price None. “Request a Demo” None. “Request Quote” Same, 2026-10-08
In the base product Timesheets, project budgets, billing, accounting Time and expense, billing and invoicing, project management, reporting and analytics, support Same, 2026-10-08
Extra modules Not listed on the product page Accounting, CRM, HR, Payroll Same, 2026-10-08
Ledger inside Yes Only with the Accounting module Same, plus Ajera help docs
QuickBooks Not needed for the books Two-way sync with QuickBooks Online, all editions except Simple Start BQE help center (search listing), 2026-10-07
Phase levels Up to six Up to four Help docs, below
Hosting Deltek’s cloud, or your own server Cloud Ajera Cloud, BQE pricing page

What each one costs

Neither vendor says. Deltek’s Ajera page offers a demo and no price. BQE’s pricing page says “Per-user pricing that’s clear and intuitive. Only pay for the additional modules you need,” and asks you to request a quote (both checked 2026-10-08).

Third-party sites guess at both, and the guesses are labeled as guesses in our Ajera cost guide and our BQE Core alternatives guide. Do not budget on them.

Ask both vendors for the same five things, in writing:

  1. A yearly total at your headcount, not a per-user rate.
  2. Everything you need to run the books. For BQE, that means the Accounting module on the quote. For Ajera, ask whether anything you need is priced separately.
  3. Whether someone who only enters time pays the same as a full user.
  4. Setup, data migration and training, each in dollars.
  5. For Ajera, the price of Deltek’s cloud and of running it on your own server, if both are offered to new customers.

Then compare yearly totals. If you pick Core without Accounting and do not already pay for QuickBooks Online, add it to Core’s side.

How each one handles phases

This is the part a principal lives with every week.

Deltek Ajera. Its help docs say you start a project by building the work breakdown structure, and that you can add “as many as six levels of phases to a project, although it is typical to limit the number of subphases to two or three” (About setting up projects, checked 2026-10-08). Each phase gets its own billing type: the phase setup page lists Time & Expense, Fixed Fee and Percent Complete among them. A phase can also be put on work hold (no new time, still billable) or billing hold (time allowed, no invoices).

BQE Core. BQE’s help center says Core phases go up to four levels deep, that each phase or sub-phase keeps its own budget, rate, billing method and manager, and that budgets entered for a phase do not roll up to the parent project unless the Cumulative option applies (Budgeted hours for phases do not roll up to the parent project; the help center blocked our direct read, so this is from its search listing, 2026-10-07). In Core, check which number a project report shows before you trust a project total.

If your phases are schematic design, design development, construction documents, bidding and construction, with a sub-level or two, neither limit gets in the way. What matters is the split you start from. Our guide to architectural fee percentage by phase has one sourced split, and the architecture fee proposal template turns it into a table.

Where the books live

Ajera keeps them. Deltek’s help docs describe vendor invoices and payments, client payments and a general ledger that “Ajera automatically adjusts” as that work happens (Ajera help docs, checked 2026-10-05). Our page on what Deltek Ajera is covers the four jobs it does.

BQE Core keeps them only with the Accounting module. Without it, BQE’s help center says Core “comes with an in-app integration with QuickBooks Online” that syncs both ways and does not sync Core projects to QuickBooks Online Projects (from its search listings, 2026-10-07). QuickBooks Desktop has its own help article; ask BQE about your version.

Our BQE Core vs QuickBooks guide covers what that sync does and does not carry. Settle this first with your bookkeeper or outside accountant. If they want the books to stay in QuickBooks, choosing Ajera means moving them out of QuickBooks and into Ajera. If they want one system for projects and books, both can do it.

Getting time in from a simpler tool

Both take hours from a file, which matters if the screens staff use every day are the complaint.

  • Ajera: an Import Time command on the Manage menu takes a .csv file with columns such as employee, date, project, phase, activity and hours. Entries land on timesheets that are not yet approved (checked 2026-10-05).
  • BQE Core: imports up to 1,000 time entries at a time from a .csv file, and only entries whose activity, project and employee already exist in Core (Time Entries, from its search listing, 2026-10-05).

So a firm on either one can keep it for billing and the books while staff log hours somewhere simpler. Our timesheet and invoice-prep demo shows what that looks like (fake data, runs in your browser).

What the vendors say about each other

BQE publishes a sales sheet, “Competitor Comparison: BQE vs Ajera,” and Monograph has a blog post on BQE Core vs Deltek Ajera (updated May 12, 2025) that ends by suggesting Monograph instead. Read both as sales pages. Ask each vendor for a demo built on one of your own projects, with your phases and your fee.

If Monograph is on your list too, see Monograph vs BQE Core and Deltek Ajera alternatives for small firms.

When to stay where you are

If you are on either one now, the books are inside it, and your phase reports match what you bill, switching means moving your ledger, your history and your invoice layouts. BQE’s help center says custom reports and invoices do not migrate to Core, and BQE quotes its own migration per job. That is your bookkeeper’s time on top of the license.

The case for moving is strongest when you are about to pay for something big anyway: a server replacement, a forced upgrade, or a renewal with a price jump. Check your renewal date and contract term before you ask for quotes.

Want help with your phase budgets?

We work with small Bay Area architecture firms on one admin bottleneck at a time, and phase budgets are one of them. We map how your firm sets phase fees and tracks hours today, show the fix, and get one piece of it working. Sometimes the answer is to keep the tool you have.

To start, email vaughn.workflowaudit@gmail.com with a line on what you use now and what bothers you about it. Or browse all guides.

Questions and answers

Is Deltek Ajera cheaper than BQE Core?

No one can tell you from public pages. Deltek shows no Ajera price on its product page, only "Request a Demo" (deltek.com, checked 2026-10-08). BQE says Core is priced per user plus the modules you add, and shows no dollar amount (bqe.com/pricing, checked 2026-10-08). Ask both for a yearly total at your headcount with the same scope, including accounting, and compare the totals.

Does BQE Core include accounting like Ajera does?

Only if you buy it. BQE lists Accounting as an additional module next to CRM, HR and Payroll (bqe.com/pricing, checked 2026-10-08). Without it, BQE's help center says Core syncs both ways with QuickBooks Online, every edition except Simple Start. Ajera includes accounts payable, accounts receivable and a general ledger as part of the product, per Deltek's help docs.

How do phases work in each?

Ajera's help docs say a project can have "as many as six levels of phases," and that most firms stop at two or three. Each phase gets its own billing type, such as Time & Expense, Fixed Fee or Percent Complete. BQE's help center says Core phases go up to four levels deep, each with its own budget, and that phase budgets do not roll up to the parent project unless the Cumulative option applies (from its search listings, 2026-10-07).

Can staff log time in another tool and send it to either one?

Both take a .csv file. Ajera's help docs describe an Import Time command on the Manage menu, with columns such as employee, date, project, phase, activity and hours. BQE's help center says Core imports up to 1,000 time entries at a time, and only for projects, people and activities that already exist in Core.

What do reviews say about Ajera and BQE Core?

On Capterra, Deltek Ajera shows 3.6 out of 5 from 62 reviews and BQE CORE Suite shows 4.5 out of 5 from 796 reviews (both checked 2026-10-05). The counts are very different and cover all firm sizes, so filter for firms your size and read the low reviews of both.

Tell me how your firm does it now

Opens your email app. Or write to vaughn.workflowaudit@gmail.com . One line is enough. No attachments, passwords or client files.