What this page is. A fee proposal template for a 5 to 25 person architecture firm, with every number left as an input. The phase split shown is one public example, named and dated. We are not lawyers, and nothing here is a contract form. Use your owner-architect agreement for the terms.
The short answer
A fee proposal answers four questions for the client: what you will do, in what phases, for how much, and what is not included. Eight parts cover it:
- Project and scope
- Phases and what you deliver in each
- Fee by phase
- Hourly rates for additional services
- Reimbursable expenses
- Payment schedule
- Assumptions and exclusions
- How long the proposal stands
The fee by phase does double duty. The client sees what each stage costs, and the same numbers become your phase budgets once the project starts.
The template
Copy this into your proposal and replace every bracket.
1. Project and scope
- Client: [name]
- Project: [name, address]
- Description: [building type, approximate size, new or renovation]
- Our services: [basic services in the phases below]
- Consultants in our fee: [for example structural, MEP, or “none”]
2. Phases and deliverables
| Phase | What you receive | Meetings or reviews included |
|---|---|---|
| Schematic design (SD) | [site plan, floor plans, massing] | [number] |
| Design development (DD) | [developed plans, outline specifications] | [number] |
| Construction documents (CD) | [permit and bid set] | [number] |
| Bidding or negotiation | [answer bidder questions, review bids] | [number] |
| Construction administration (CA) | [site visits, submittals, RFIs, pay applications] | [visits per month, months] |
| Closeout | [punch list, record documents] | [number] |
3. Fee by phase
Fee method: [fixed fee / hourly with a not-to-exceed / percentage of construction cost].
| Phase | Share of fee | Fee |
|---|---|---|
| SD | [ ]% | $[ ] |
| DD | [ ]% | $[ ] |
| CD | [ ]% | $[ ] |
| Bidding | [ ]% | $[ ] |
| CA | [ ]% | $[ ] |
| Closeout | [ ]% | $[ ] |
| Total basic services | 100% | $[ ] |
4. Hourly rates for additional services
| Role | Hourly rate |
|---|---|
| Principal | $[ ] |
| Project architect | $[ ] |
| Designer | $[ ] |
| Drafter | $[ ] |
| Admin | $[ ] |
Additional services start only after written approval. [List the usual ones: client-requested redesign after approval of a phase, extra meetings, extra CA months.]
5. Reimbursable expenses
[Printing, permit and plan check fees paid on the client’s behalf, travel outside the [area], courier.] Billed at [cost / cost plus [ ]%].
6. Payment schedule
[Monthly, in proportion to the work completed in each phase / a retainer of $[ ] applied to the final invoice.] Invoices are due in [ ] days.
7. Assumptions and exclusions
- [Survey, geotechnical report and hazardous materials testing by the client]
- [Permit fees paid by the client]
- [Renderings beyond [number]]
- [Anything else this fee does not cover]
8. Validity
This proposal stands for [ ] days from [date].
Where the phase split comes from
There is no industry rule for splitting a fee. Public owners publish theirs, and they make a fair first draft. Washington State’s Office of Financial Management gives this split of the basic services fee for state building projects (Washington OFM, Chapter 08: A/E fee guidelines, page last modified 2026-06-01, checked 2026-10-06):
Those guidelines are for Washington State agency projects, not Bay Area houses or tenant improvements. A small private job may spend more in SD and skip formal bidding. Before you fill in the column, look at how your hours actually fell across phases on two or three finished projects. Our guide on architectural fee percentage by phase works through a full example, from the fee to budget hours to the weekly check.
When the proposal answers a public RFP in California
For public work the order is often different. California Government Code 4526 says state and local agencies select architects “on the basis of demonstrated competence and on the professional qualifications necessary for the satisfactory performance of the services required” (Gov. Code 4526, checked 2026-10-07). Section 4528 has a state agency negotiate a fee with the best qualified firm, and move to the next firm if that fails; local agencies may follow the same steps (Gov. Code 4528, checked 2026-10-07).
In practice that means:
- The submittal is mostly qualifications: team, resumes, similar projects, approach.
- The fee often comes later, in negotiation, if you rank first.
- Some local RFPs still ask for an hourly rate schedule or a fee in a separate file. Read the RFP’s submittal list line by line. Our architecture RFP example walks through one from San Mateo County that asked for a lump sum fee by phase.
Keep this template filled in for your common project types anyway. When the agency calls to negotiate, the phase split and rates are ready, and they match the hours you will track.
After the client signs
The fee by phase becomes the budget. Put each phase fee on your project list, record every hour by project and phase, and once a week compare fee used with percent complete. If you are picking software to hold these budgets, our Monograph vs BQE Core comparison shows how each one sets a phase budget.
Want help with fee proposals or phase budgets?
We work with small Bay Area architecture firms on one admin bottleneck at a time. Fee proposals and phase budgets are two of them. We map how your firm builds a fee today, show the fix, and get one piece working, for example a fee sheet that fills the proposal table and your phase budgets from the same numbers. Sometimes the answer is to keep what you have.
To start, email vaughn.workflowaudit@gmail.com with a line on how you build fee proposals now. Or browse all guides.
Questions and answers
What goes in an architecture fee proposal?
The project and scope, the phases with what you deliver in each, the fee for each phase, hourly rates for work outside the scope, reimbursable expenses and any markup, a payment schedule, assumptions and exclusions, and how long the proposal stays valid. The template on this page has a slot for each.
How do you write an architectural proposal?
Answer four questions for the client in this order: what you will do, in what phases, for how much, and what is not included. The template on this page does it in eight parts: project and scope, phases and deliverables, fee by phase, hourly rates for additional services, reimbursable expenses, payment schedule, assumptions and exclusions, and how long the proposal stands. If the proposal answers a public RFP, follow the RFP's own section list instead.
How should I split the fee across phases?
There is no single rule. One public example is Washington State's A/E fee guide for state building projects: schematic design 18%, design development 20%, construction documents 31%, bidding 2%, construction 27%, closeout 2% (Washington OFM, page last modified 2026-06-01). Check it against two or three of your own finished projects before you use it. Our guide on architectural fee percentage by phase covers this in detail.
Do California public agencies want a fee with the RFP response?
California Government Code 4526 says state and local agencies select architects "on the basis of demonstrated competence and on the professional qualifications necessary". Section 4528 has state agencies negotiate a fee with the best qualified firm, then the next one if that fails; local agencies may use the same steps. So many public solicitations ask for qualifications first and the fee later. Read each RFP: some local agencies still ask for a fee schedule or rates with the submittal.
Should the fee be fixed, hourly, or a percentage of construction cost?
The template works with any of the three. Put the method in one line at the top of the fee section, then show the split by phase either way, because the client and your own phase budgets both read it by phase. For hourly or percentage fees, add a not-to-exceed amount or an estimate per phase so the client can see the total.